Laboratory Solution Offering
Where Learning Happens on the Floor First
Before any trainee touches a configuration screen, they walk the warehouse. Our in-house lab is the foundation every learning outcome is built on.
Infrastructure
Physical Lab Setup
A purpose-built warehouse training environment — not a classroom with slides, but a working floor with real infrastructure.
Racking & Storage
Multi-tier racking systems covering bulk, shelving, and high-rack storage types — mirroring the storage section configurations trainees will build in SAP EWM.
Scanning Equipment
RF scanners and mobile devices used for goods receipt, transfer orders, and physical inventory — the same hardware found on live warehouse floors.
Floor Layout
Defined zones for inbound, outbound, staging, and returns — each mapped directly to warehouse structure nodes in the SAP system.
Live SAP EWM System
A dedicated S/4 HANA EWM sandbox connected to the lab floor, so every physical movement has a corresponding system transaction.
System
Live SAP EWM System Walkthrough
The lab is connected to a live SAP S/4 HANA EWM environment. Trainees configure, execute, and troubleshoot in real system sessions — not pre-recorded demos.
Warehouse Structure Configuration
Define warehouse numbers, storage types, sections, and bins — then walk the physical equivalent in the lab to understand why each setting exists.
Inbound Processing
Execute goods receipt, putaway strategies, and transfer order creation — first physically on the floor, then replicated in the system.
Outbound Processing
Pick, pack, and goods issue workflows run end-to-end — trainees operate the scanner before they configure the process.
Physical Inventory & Reporting
Cycle counting, stock differences, and EWM reporting — grounded in real inventory discrepancies observed on the lab floor.
In Practice
How Trainees Use the Lab
The lab is not a demonstration space. Every trainee operates it as part of the programme — handling goods, running transactions, and building the physical intuition that makes system configuration meaningful.
Stage 01
Floor Orientation
Trainees map the physical warehouse — racking, zones, bin topology — before opening any SAP screen. The floor is the first textbook.
Stage 02
Manual Execution
End-to-end inbound and outbound runs using paper clipboards, physical labels, and manual scanning — building operational instinct before system configuration.
Stage 03
System Realization
Trainees configure the SAP EWM sandbox to mirror what they built on the floor — every SPRO node grounded in a physical reality they have already experienced.
BodhanLabs Core Framework
Master Laboratory Record & Systems Realisation Workbook
Experience Core Warehouse Operations First, System Configuration Second.
The Physical Warehouse Infrastructure & Floor Model
Identify and understand the functional logistics footprint of the warehouse lab floor before touching any system configuration. Trainees execute stock receipts and end-to-end inbound and outbound warehouse logistics to build genuine domain expertise in warehouse operations.
Storage Areas & Aisle-to-Bin Topography Setup
Map every storage area, aisle, and bin on the physical floor — the spatial foundation for all subsequent system configuration.
Bin Labelling
Apply physical bin labels that correspond directly to the bin master records trainees will create in SAP EWM.
Work Centre Allocations
Understand how packing, quality inspection, and staging work centres are physically positioned and operationally assigned.
Stock & Shipping Labels
Produce and apply stock labels and shipping labels for packaging and dispatch — the physical precursor to PPF and label management configuration.
Inventory Handling
Handle physical stock movements, understand material characteristics, and practise safe inventory management on the floor.
Manual Execution
End-to-End Manual Inbound Logistics Execution
Execute a complete mock inbound supply process manually using paper clipboards, boxes, and manual labelling runs — before any system involvement.
Unloading at Doors
Receive inbound trucks at the dock doors; record quantities and carrier details manually.
Receiving & Quality Inspection Area
Inspect goods against purchase order details; flag discrepancies on the paper clipboard.
De-consolidation for Mixed Pallets
Break down mixed pallets into individual SKUs and sort by storage type destination.
Conveyor Putaway Placement
Move stock to the correct aisle and bin using the physical floor layout as the guide.
Packing Station Repacking
Repack goods at the packing station and apply outbound shipping labels.
Staging Area Consolidation
Consolidate outbound orders in the staging area, matching pick lists to physical stock.
Dispatch & Loading Outbound
Load outbound shipments at the dispatch doors and complete the manual goods issue record.
S/4HANA ERP to SAP EWM System Realization Build
Sandbox Implementation
Trainees who have fully mastered physical operations now configure the backend SPRO IMG system environment to digitally mirror the floor layout. They configure, test, and document the 6 core pillars of advanced warehouse execution inside the sandbox environment client.
Enterprise System Interface, Master Data & IDoc Distribution
Configure the ERP-to-EWM interface, define organisational mappings, set up master data, and establish the IDoc distribution model for seamless document flow between S/4HANA ERP and SAP EWM.
Inbound & Outbound Flow Realization with Warehouse Strategies
Realize end-to-end inbound and outbound document flows with full ERP/EWM document mappings. Configure putaway and picking warehouse strategies to govern stock movement logic.
Process-Oriented & Layout-Oriented Storage Control
Configure advanced Process-Oriented Storage Control (POSC) and Layout-Oriented Storage Control (LOSC) routing paths to manage multi-stage movements and Automatic Wave Control Routing.
Door, Staging Area, Work Centre & Packaging Determinations
Build automated determination engines to route inventory dynamically based on material characteristics and structural parameters — covering Door Determination, Staging Area & Work Centre Determination, Kit-To-Stock (KTS), and Kit-To-Order (KTO).
Production Staging, Material Consumption & FG Receipt Processing
Configure advanced intra-logistics interfaces to integrate warehouse operations with manufacturing lines, supporting fluid assembly processes and finished goods receipt back into the warehouse.
Label Management, RF Queue, Barcode & PPF Automation
Configure barcode label printer setup, PPF setup automation, mobile RF queue management, Stock Difference Analyzer processing, Kit-To-Stock (KTS), and Kit-To-Order (KTO) label flows.
Accreditation
Instructor Accreditation & Lab Sign-Off
Each phase carries a formal sign-off milestone. Trainees advance only after demonstrating mastery — on the floor and in the system.
Phase 1 Complete
Trainee successfully built, labelled, and executed all manual inbound and outbound floor scenarios.
Phase 2 Complete
Trainee successfully realized all SPRO organisational nodes and master records in the sandbox environment.
Phase 3 Complete
Trainee successfully configured and passed validation testing across all 6 core EWM pillars.
Technical Trainer Assessment Guide & System Evaluation Runbook governs all phase validations.
The Difference
Lab Training vs Classroom-Only
The difference is not just methodology — it is the depth of understanding a trainee carries into their first live project.
Warehouse Knowledge
Theoretical understanding from slides and diagrams
Physical floor experience — racking, zones, bins, and real stock movements before any system work
System Configuration
Configuration steps followed from a manual without operational context
Every SPRO node grounded in a physical reality the trainee has already operated
Inbound & Outbound
Process diagrams and demo walkthroughs
Manual execution on the floor first — clipboards, labels, scanning — then system realization
Assessment
Written or MCQ test
Formal instructor sign-off at each phase — floor execution and system validation both required
Ready to Train on a Real Warehouse Floor?
Join the next cohort and build the skills that live projects demand.